14 ISE maintenance
ISE maintenance actions
Conditioning the tubing
Roche Diagnostics
E-62
9 Install the tubing on the tubing adapters of the ISE Calibrator indirect/urine and
ISE Reference Solution bottles.
The two tubing adapters are slightly different, but the process of installing the
tube is the same.
A
ISE Reference Solution tubing adapter
Figure E-17
o
Pull the tube through the hole that aligns with the clips.
o
Insert the nozzle in the tube.
o
At the top of the adapter, pull through the tube until the nozzle is flush with
the end of the adapter. There should be no slack.
o
Fix the tube to the clips.
With the adapter that offers two clip positions, use the inner position.
o
Insert the tubing adapter in the appropriate bottle.
10 Close the ISE cover, then the left service flap and the main cover.
11 Press
to confirm completion of the action.
The system now performs the maintenance action Prime ISE Reference and
Calib.
A message will inform you when the maintenance action is complete.
The system now performs the maintenance action Initialize ISE Reference
Sensor.
You are asked to remove the tubing adapter from of the ISE Reference Solution
bottle.
12 Open the ISE cover.
13 Remove the tubing adapter from of the ISE Reference Solution bottle.
o
Have a clean lint-free tissue ready.
o
Lift the tubing adapter and place it on the tissue.
Cedex Bio System
A
B
B
ISE Calibrator indirect/urine tubing
adapter
Operator's Manual · Version 3.1
Need help?
Do you have a question about the Cedex Bio System and is the answer not in the manual?