5 SUBSET PROCEDURES
PROCEDURE A.
Preparing a block of 4 K2
1. Attach a K2 enclosure on K2-CHARIOT.
Fully rotate the rear rigging arms of the K2-CHARIOT.
Position the K2 enclosure on the K2-CHARIOT dolly
Secure the enclosure at the front using the LINK hole.
Lift the rear of the enclosure and rotate the dolly rear
Secure the enclosure using the LINK hole.
rigging arm in its upward position.
w w w . l - a c o u s t i c s . c o m
1 7 / 52
K2_RM_EN_0.5