iDM TERRA SWM 3-13 HGL P Technical Documentation And Installation Instructions page 36

With navigator 2.0 controller, brine- or groundwater heat pump with inverter-technology
Table of Contents

Advertisement

9. Allgemeine Informationen
Heat source
Connection plan
PE-plastic pipe Ø 25mm
Technical data fl at collector
Type BSC
Number of pipe circuits
Total length of pipe
Surface area supplied
Diameter of connection line
Length of Distributor
Brine mixture*
* Brine mixture (30% antifreeze concentration, excluding the content of the distributing main
Laying distance: app. 80 cm
Laying depth: 110-120 cm
No te:
- The pipes should be laid several months before
the heating period. The relevant preparation times
must be taken into account in the overall planning
work.
- Vegetation with deep roots must be avoided at all
costs.
- Rainwater should not be drained off via drainage as
it is required to regenerate the ground.
36
Connection pipe to the
heat pump on site
manifold length L
1 1/4"
60mm
Unit
4
4
lfm
400
320
mm
40
mm
240
lt.
140
Installation instructions TERRA SWM
Fill- and flushing device
Mud trap
Stopcock
5
6
5
6
500
600
400
480
40
40
300
360
175
210
- When back-fi lling, a signal band of approx. 0.5 m
should be laid above the pipeline to avoid subse-
quent damage. When the fl at collectors, the surface
area above must not be sealed off (e.g. asphalt).
Supply
Return
(C) IDM ENERGIESYSTEME GMBH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Terra swm 3-13 series

Table of Contents