assembly and hydraulic installation
In the scope of delivery of the TERRA SWM are fi ve
piece of fl exible connecting hoses. Before connecting
the hoses, the supplied insulation must be pushed
over the hoses. To facilitate the work, it is recommen-
ded to put powder in to insulation. Then the insulation
can be pushed more easily over the connecting
hoses.
Connection heat pump fl ow
Connecting hoses with fully assembled insulation
Connection brine fl ow
Before connecting the hoses, the supplied rubber
grommets must be pushed over the insulation.
Now the connecting hoses can be connected as
described as followed. Where the connection hoses
Connection brine return
are mounted is specifi ed with stickers inside the heat
pump.
Connection HGL pipe
Connection heat pump return
23
(C) IDM ENERGIESYSTEME GMBH
Installation instructions TERRA SWM