GE LOGIQ A3 Basic Service Manual page 60

Table of Contents

Advertisement

GE H
EALTHCARE
D
5213326-100, R
IRECTION
Section 3-2Receiving and Unpacking LOGIQ A3
When a new system arrives, ensure that none of the components are damaged or in short supply. If
shipping damage or shortage occurs, contact the address shown in chapter-introduction.
The Packaging/Unpacking Procedure.
Topics discussed in the Packaging/Unpacking Procedure:
1.) Check the Shipment,
2.) Unpack the Unit,
3.) Handling Incomplete or Damaged Shipment
Please read these procedures before packing/unpacking the LOGIQ A3.
We strongly advice you to store the LOGIQ A3 packing material in undamaged condition in case of
future transportation.
Do not lift the unit by the Keyboard. This may cause equipment damage.
CAUTION
The crate with the LOGIQ A3 weighs approximately 70 kg. Be prepared for a sudden shift of
weight as the unit is removed from its base (pallet).
CAUTION
Inspect the Shock watch and Tilt watch. Ensure that they are not fused. (Refer to the instructions
attached on the packing Box on howto check the Shcik watch and Tiltwatch)
CAUTION
Approv e d Docu m ent - 5213326-100TPH_r3.pdf Page 60 of 252
3
EVISION
Chapter 3
LOGIQ™ A3 S
M
ERVICE
ANUAL
3-3

Advertisement

Table of Contents
loading

Table of Contents