System Flushing Procedure
OPEN
90°
CLOSE
8 - Ensure the isolation valve
on the hot supply is
closed before
Sterilization Process
NOTE: Not a replacement for chlorination
1 - Move handle to open position
3 - Remove the cover from each
inlet
© Intatec Ltd 2016
9 - Unscrew the connector plug using
suitably sized spanner and refit
the check valve and end cover
2 - Isolate both inlet tails
4 - Remove hot and cold inlet plugs
using a 10mm Allen key
14
10 - Repeat the procedure for the
cold inlet side before opening
both isolation valves
OPEN
90°
CLOSE
2A - Turn to the
closed position
4A
REMOVE