Installing Optional Components; Installing Antiseismic Kits - Huawei UPS5000-S Series User Manual

Hide thumbs Also See for UPS5000-S Series:
Table of Contents

Advertisement

UPS5000-S-(350 kVA-800 kVA) User Manual
User Manual
Procedure
Step 1 Install a battery rack and batteries.
For details, see the battery installation guide delivered along with batteries.
----End

3.2.4 Installing Optional Components

3.2.4.1 Installing Antiseismic Kits

Install antiseismic kits only when the cabinet is ground-mounted.
Step 1 Mark mounting holes on the ground based on the marking-off templates. Figure 3-36 to
Figure 3-38 show the dimensions of antiseismic kit mounting holes.
Issue 05 (2019-02-27)
Before installing batteries, read through the battery safety precautions, obtain the delivered
battery installation guide, and install batteries as instructed.
Place the batteries in a correct way to prevent vibrations and shocks.
Install the batteries from the lower layer to the upper layer to prevent falling over due to
imbalance.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents