Huawei UPS5000-S Series User Manual page 88

Hide thumbs Also See for UPS5000-S Series:
Table of Contents

Advertisement

UPS5000-S-(350 kVA-800 kVA) User Manual
User Manual
Figure 3-25 Installing an expansion bolt (unit: mm)
1.
2.
3.
4.
----End
Combining Power Cabinets and Bypass Cabinets
The power cabinets and bypass cabinets are separately packed for delivery. Before installing
the UPS, combine the power cabinets and bypass cabinets. Before combining the cabinets,
ensure that the required fittings are complete. Table 3-9 lists the fittings.
Table 3-9 Fitting list
Mounting
Number of
Fitting
Fittings
Bottom
2
connecting
plate
Top
2
connecting
plate
Soft
2
connecting
copper bar
Grommet
N/A
Issue 05 (2019-02-27)
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
Partially tighten the expansion bolt and vertically insert it into the hole. Knock the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
Partially tighten the expansion bolt.
Remove the bolt, spring washer, and flat washer.
Screw
Specifications
M12x25
M6x30
M12x45
N/A
Copyright © Huawei Technologies Co., Ltd.
Number of
Torque
Bolts (PCS)
(N· m)
8
47
8
3
10
47
N/A
N/A
3 Installation
Remarks
Fittings are delivered
with the UPS. You can
see the fittings after
unpacking the bypass
cabinet.
The two soft copper bars
are numbered 52.
If holes are drilled for
routing cables at the top
of the cabinet, attach
grommet strips on the
hole edges to protect
79