UPS5000-S-(350 kVA-800 kVA) User Manual
User Manual
Connecting Other Signal Cables
Connect signal cables for each UPS.
3.4 Installation Verification
Table 3-11 lists check items.
If the check results of listed items 8 and 9 in Table 3-11 do not meet the acceptance criteria,
the UPS may be damaged.
Issue 05 (2019-02-27)
Figure 3-94 Connecting signal cables to a dual-bus system
Copyright © Huawei Technologies Co., Ltd.
3 Installation
143