UPS5000-S-(350 kVA-800 kVA) User Manual
User Manual
Figure 3-30 Removing the switch extension rod
(1) Blue mark
Step 9 Install the soft copper bars between power cabinet 1 and its adjacent bypass cabinet.
1.
2.
Issue 05 (2019-02-27)
Cut off the cable ties bound between holes in soft copper bars numbered 23, 24, 25, 26,
and 30.
Secure the soft copper bars numbered 23, 24, 25, 26, and 30 using M12x45 screws, as
shown in Figure 3-31.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
83