Cc-Link Ie Field - Mitsubishi Electric M80 Series Maintenance Manual

Hide thumbs Also See for M80 Series:
Table of Contents

Advertisement

M800/M80/E80 Series Maintenance Manual
1 System Basic Configuration

1.4.5.3 CC-Link IE Field

FCU8-EX564
[LED]
No.
Name
(1)
L ERR
(2)
SD/RD
(3)
D LINK
(4)
MST
(5)
ERR
(6)
RUN
(7)
LINK
(8)
L ER
(1)
(2)
(3)
(4)
(5)
(6)
Color
State
Red
Not lit
Lit
Green
Lit
Not lit
Green
Lit
Flashing
Not lit
Green
Lit
Not lit
Red
Not lit
Flashing
(500 ms interval)
Flashing
(200 ms interval)
Lit
Green
Lit
Not lit
Green
Lit
Not lit
Red
Lit
Not lit
(7)
(8)
Normal data received and loopback not performed
Abnormal data received or loopback being performed
Data being sent or received
Data not sent nor received
Data link (cyclic transmission being performed)
Data link (cyclic transmission stopped)
Data link not performed (disconnected)
Operating as master station
Operating as local station
Normal operation
A data link faulty station detected
Failure occurring
Error in all stations detected or occurring
Hardware running normally
Hardware error occurring
Link-up
Link-down
Normal data received and loopback not performed
Abnormal data received or loopback being performed
29
Details
IB-1501273-F

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents