Planning Installation

Choose a location for the library. See
Plan the SAS or Fibre Channel configuration and obtain the necessary cables. See
Configuration Requirements"
Plan the rack layout. See
Internal IP Range Selection
3.2

Location Requirements

NOTE
Table 3: Location Requirements
Criteria
Rack Requirements
Rack Space
Requirements
Room Temperature
Power Source
Air Quality
Humidity
511026 Rev. 07-01-19
"Location
or
"Fibre Channel Configuration
"Planning the Module and Rack
The library was designed for rack installation.
Rack installations must use the provided rack rails.
Select a location with access to the host server.
Choose a location that meets the criteria in the table below.
Definition
Standard 19-inch rack (minimum depth of 1 meter) with an appropriate # of U's
(Rack Units) of clearance for the planned module quantity
3U for the Base Module and 3U for each Expansion Module
10-35º C (50-95º F)
AC Power Voltage: 100-240 VAC
Line Frequency: 50-60 Hz
Library Located near AC Outlet(s)
The AC power cord is the library's main AC disconnect device and must be easily
accessible at all times.
Place the library in an area with minimal sources of particulate contamination
Avoid areas near frequently used doors and walkways, stacks of supplies that
collect dust, printers, and smoke-filled rooms
Excessive dust and debris can damage tapes and tape drive
20-80 percent RH non-condensing