Mira Agile S B97C Installation And User Manual page 14

Table of Contents

Advertisement

3
Drill holes
here
Fit the Pipe Shroud over the pipe stubs. Use
the two holes in the pipe shroud as a template
and drill through them into the finished wall
surface. Drill through the 2x holes in the
shroud.
5
Fit the wallplate over the pipes ensuring
they do not push back into the wall and are
within the cut length tolerance (Min 18 mm
to Max 28 mm).
1285246-W2-D
Pipe Shroud
6 mm
Wallplate
14
4
Wall
Plug
For solid wall installations, fit the supplied
wall plugs (alternative fixings can be used
- countersunk head only) to allow fixing of
the wallplate.
6
Using the fixing screws provided, fix the
wallplate to the wall. Make sure that the
wallplate is level.
Seal the
pipework where
it comes through
the wall
Integrated
Spirit Level
Screw

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agile s eco b97cAgile store ev+ b97dAgile ev+ b97cAgile erd+ b97dAgile sense erd+ b97d

Table of Contents