Mira Agile S B97C Installation And User Manual page 13

Table of Contents

Advertisement

d. Once the pipework is in place, slide the First Fix Pipe Guide over the protruding
pipework.
Important! At this stage re-check the pipework is square and level*.
Mark and drill the pipe guide fixing holes then attach directly to the noggin.
This can remain within the wall.
1
Secured
Pipework
Hot
Install the pipework for stud partition or solid
wall, making sure they are level, square
and secure. When tiling the wall fit the Pipe
Shroud over the pipe stubs. This will prevent
damage to the to the pipe surface from tiling
and grout etc and assist with the correct pipe
centres and alignment.
* Pipework that is not level will make final assembly of
the valve very difficult
IMPORTANT !
Use 15 mm
copper pipe to
valve
Pipe
Shroud
Cold
LEVEL
2
Hacksaw
Remove the pipe shroud and trim the pipe
stubs to 23 mm +/-5 mm from the wall
surface DO NOT use a hacksaw as the
sharp edges may damage the seals in the
mixer valve. Note: De-burr the pipework if
necessary.
13
LEVEL
Min 18 mm to Max
28 mm from finished
wall surface
Tiles
Plasterboard
Pipe Slice
1285246-W2-D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agile s eco b97cAgile store ev+ b97dAgile ev+ b97cAgile erd+ b97dAgile sense erd+ b97d

Table of Contents