Mira Agile S B97C Installation And User Manual page 11

Table of Contents

Advertisement

1. Pipework must be at 50 mm centres, level
and perpendicular to the finished wall
surface (see fig 1).
2. It is recommended that the pipework is
secure but not rigidly fixed at this stage,
in case of further adjustment when the
retaining wallplate is fitted.
3. Only use Ø15 mm copper pipe for
connection to the valve.
DO NOT use any other pipe sizes.
4. Ensure you have enough pipework through
the wall to allow it to be cut to the specified
length when wall is finished (refer to the
instruction on page 10).
5. The drill holes for the central fitting of the
wallplate screws must be into brick, wooden
noggin or similar sound wall structure.
We recommend the sound wall structure
should extend to an area approximately 30
mm around the pipe centres (see fig 2).
6. This product does not have a shroud,
accurate drilling of the tiles is essential to
allow the wallplate to prevent water ingress
and seal correctly
Hole size for tile drilling (fig 3)
Min - 16 mm
Max - 19 mm
fig 1
Solid Wall
Pipe work installation viewed from above.
fig 2
fig 3
11
Make sure that
the pipework is
level
Pipe Centres
(50 mm)
30 mm
30 mm
Ø 16 - 19 mm
1285246-W2-D
Solid Wall

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agile s eco b97cAgile store ev+ b97dAgile ev+ b97cAgile erd+ b97dAgile sense erd+ b97d

Table of Contents