How to Install
Illustration 5.8 Recommended Lifting Method, Frame Sizes F1,
F2, F9 and F10
Illustration 5.9 Recommended Lifting Method, Frame Sizes F3,
F4, F11, F12 and F13
®
VLT
AQUA Drive FC 202 Design Guide
Illustration 5.10 Recommended Lifting Method, Frame Sizes F8
NOTE
The plinth is provided in the same packaging as the
frequency converter but is not attached to frame sizes F1-
F4 during shipment. The plinth is required to allow airflow
to the frequency converter to provide proper cooling.
Position F-Frames on top of the plinth in the final instal-
lation location. The angle from the top of the frequency
converter to the lifting cable should be 60° or greater.
In addition to the drawings above, a spreader bar is an
acceptable way to lift the F-Frame.
5.2.5 Tools Needed
To perform the mechanical installation, the following tools
are needed:
®
MG20Z102 - VLT
is a registered Danfoss trademark
•
Drill with 10 mm or 12 mm drill
•
Tape measure
•
Wrench with relevant metric sockets (7–17 mm)
•
Extensions to wrench
•
Sheet metal punch for conduits or cable glands
in IP21 (NEMA 1) and IP54 (NEMA 12) units.
•
Lifting bar to lift the unit (rod or tube max. Ø 25
mm (1 inch), able to lift minimum 400 kg (880
lbs)).
•
Crane or other lifting aid to place the frequency
converter in position.
•
Use a Torx T50 tool to install the E1 in IP21 and
IP54 enclosure types.
5
5
93