YASKAWA MP2000 Technical Note page 16

Hide thumbs Also See for MP2000:
Table of Contents

Advertisement

TECHNICAL NOTE
MOTION APPLICATION ENGINEERING GROUP
The above drawing execution chart graphically illustrates the Drawing Family and Function table
from the previous page.
At power up, the A drawing executes AND completes before other drawings execute.
The A drawings execute once only at power up.
The high scan drawings always complete within the high speed scan set time as
illustrated above.
In the remaining time of the high speed scan, the low scan drawings execute in time
slices until they complete execution within the low speed scan set time.
At the completion of the low scan drawings, background system tasks are executed.
If an interrupt condition occurs, the I drawing executes immediately, then normal
scanning resumes.
Setting Parameters and Monitor Parameters are updated each high speed scan while
low scan I/O updates occur every low speed scan set time.
The update of I/O and parameters as well as understanding drawing execution is critical to
code development so that the proper interlocks exist to obtain expected logical results.
Yaskawa Electric America - 2121 Norman Drive South – Waukegan IL 60085
11/23/2005
Drawing Execution Chart
(800) YASKAWA - Fax (847) 887-7280
16 of 16
eng/05.055/MCD

Advertisement

Table of Contents
loading

Table of Contents