Major Components - FULTON RB Series Installation, Operation And Maintenance Manual

Gas/oil/dual fuel horizontal steam boilers
Table of Contents

Advertisement

INSTALLATION - 2
2.4

MAJOR COMPONENTS

Main steam valve. Steam outlet stop valve fitted centrally on the top centre line of the boiler.
Steam vent valve. Fitted to the rear, on the top centre line of the boiler.
Safety valve. Fitted to the rear, on the top centre line of the boiler.
Boiler control box
Steam pressure gauge. Fitted to the control box mounting plate on the side of the boiler.
Main boiler blowdown valve. A main boiler blowdown valve connected to pipework at the front
of the boiler on the underside centre line.
Automatic timed blowdown valve (optional). Connected to the manual main boiler blowdown
valve.
Water level gauge set (sight glasses)
Boiler feedwater pump (Grundfos). 1 x Grundfos feedwater pump is provided for the boiler
feedwater mounted to side rear of the boiler supporting frame.
For more information on the feedwater pump, please refer to the Grundfos OEM literature.
Feedwater valve. Water supply inlet stop valve mounted on the side of the boiler.
Feedwater non-return (check) valve. Water supply NRV mounted on the side of the boiler
directly under the main feedwater inlet valve.
Boiler water sample valve. Fitted behind the feedwater inlet on the control side of the boiler.
Boiler water sample cooler. 1 x boiler water sample cooler is mounted to the rear of the boiler
on the controls side.
For more information on the water sample cooler, please refer to Appendix A - TI-122-Boiler
Water Sample Cooler.
TDS Blowdown System (optional)
Burner. Mounted to the front access door.
Note: For detailed burner information, see burner manufacturers Installation & Maintenance manual.
Burner Programmer. Is located in the burner mounted control panel.
Gas Train Assembly. Consists of pilot and main supply lines, each line having a manual cock, a
governor and solenoid operated valves.
Gas booster
Flame sensor (UV photocell)
Burner sequence control
Page 6
Fulton Ltd
RB-RBC-IOMM-2015-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents