Front Access Door Insulation - FULTON RB Series Installation, Operation And Maintenance Manual

Gas/oil/dual fuel horizontal steam boilers
Table of Contents

Advertisement

MAINTENANCE - 4
4.8.2

FRONT ACCESS DOOR INSULATION

When handling ceramic fibre always follow the local regulations regarding such materials, including the
use of breathing apparatus, suitable body protection and protective gloves.
The front access door is lined with end-on ceramic fibre leaving an air gap between the fibre and
the boiler tube face plate.
The face of the boiler front tube plate is also insulated with end-on ceramic fibre, the insulation is
positioned around the perimeter of the shell and over the area of tube plate above the water level.
The insulation is glued into position using a high temperature adhesive.
Inspection of the tube plate to shell weld will require insulation to be removed, it is important after
inspection to replace with new high temperature end-on fibre, available with adhesive from Fulton.
Burner
blast tube
Door insulation
Page 38
!
WARNING
Front
access door
Figure. 26 - Front Access Door Insulation
Boiler tube
plate insulation
RB-RBC-IOMM-2015-1
Fulton Ltd

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents