Annually In Addition - FULTON RB Series Installation, Operation And Maintenance Manual

Gas/oil/dual fuel horizontal steam boilers
Table of Contents

Advertisement

Fulton Ltd
4.11.5
ANNUALLY
It is a requirement of the Factories Act and Pressure Systems Regulations (UK only) that the
boiler is internally inspected and re-certified at not more than 14 month intervals.
It is normal practice to carry out an annual service during which your insurance surveyor would
attend to carry out the statutory inspection. The scope of a full insurance strip-down is such that
it should only be attempted by persons competent to do so who have had the necessary training,
and have the required test equipment. Fulton Ltd can offer this service if required.
The engineering surveyor may require the removal of the ceramic fibre insulation around the
periphery of the front tube plate to facilitate inspection of the shell to tube plate weld.
The standard Fulton service kit includes replacement ceramic fibre material which must be glued
in place with the adhesive supplied. It is vital the material is fitted ensuring the ends of the fibre
face into the centre of the boiler.
For burner maintenance, refer to the burner manufacturer's Installation and Maintenance
instructions.
RB-RBC-IOMM-2015-1
MAINTENANCE - 4
IN ADDITION
Page 45

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents