Siting; Ventilation - FULTON RB Series Installation, Operation And Maintenance Manual

Gas/oil/dual fuel horizontal steam boilers
Table of Contents

Advertisement

INSTALLATION - 2
2.2.1

SITING

(Reference should be made to Utilisation Procedures as stated in IGE/UP/10 Part 1
Communication 1676, and in particular to Section 5, Location of Appliances).
The boiler house should be sufficiently sized to allow easy and safe access to all parts of the
boiler for operational and maintenance purposes.
Reference should be made to Appendix A - TI-135-RB Dimensions & Specification &
TI-109-RBC Dimensions & Specification to ascertain the relevant dimensions and weights.
The flooring must be level, laid in a non-combustible material and be of sufficient strength to
support the boiler.
Make sure that lifting equipment complies with all local regulations and is suitable for the job.
2.3

VENTILATION

Adequate fresh, clean air is necessary for safe and efficient combustion, and should be provided
at high and low level in accordance with BS 6644 1991 and IGE/UP/10 Part 1 Communication
1676.
Note: Ensure that there is adequate ventilation in the boiler room. Lack of ventilation will create a high
temperature and cause control lockout. There is a minimum ventilation requirement to supply the air for
combustion.
Note: Do not keep exhaust fans running with windows, doors and vents closed, this will interfere with the
necessary boiler draught.
Note: Do not store chemicals such as perclorethylene in the boiler house, the fumes may damage the boiler and
flue and cause the burner to lock out on flame failure.
Note: see Appendix A - TI-135-RB Dimensions & Specification & TI-109-RBC Dimensions & Specification
for low and high level values.
Page 4
!
WARNING
Lifting Equipment
You can be injured if you use faulty lifting equipment.
Make sure the lifting equipment is in good condition.
Fulton Ltd
RB-RBC-IOMM-2015-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents