Zero Clearance Model Installation Procedure - Real Flame Heatseeker Series Installation & Operating Manual

Gas firebox
Table of Contents

Advertisement

HEATSEEKER ZERO CLEARANCE MODEL
Heatseeker Zero Clearance Installation Procedure
TICK BOXES
Connect to gas supply
Connect to power supply
Install flue to 600mm minimum above roof line. (Min. total flue run 3.6m)
Plaster to unit with trim removed
Install trim
Assemble unit as per page 19
Test the unit for safe operation and show customer correct operating procedures.
Flue Size
MODEL
600
850
1000
26
Inner
150mm Gal
200mm Gal
200mm Gal
250mm Gal
200mm Gal
250mm Gal
Outer

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents