HEATSEEKER ZERO CLEARANCE MODEL
Heatseeker Zero Clearance Installation Procedure
TICK BOXES
Connect to gas supply
Connect to power supply
Install flue to 600mm minimum above roof line. (Min. total flue run 3.6m)
Plaster to unit with trim removed
Install trim
Assemble unit as per page 18
Test the unit for safe operation and show customer correct operating procedures.
Flue Size
MODEL
600
700
850
1000
Inner
150mm Gal
200mm Gal
150mm Gal
200mm Gal
200mm Gal
250mm Gal
200mm Gal
250mm Gal
Outer
19