Installation
Arrangement and connection of the power terminals
The arrangement and size of the connection terminals depends on
the construction of the power section (FS1, FS2, FS3).
2
mm
MMX12AA1D7...
0.2 - 2.5
MMX12AA2D4...
MMX12AA2D8...
MMX32AA1D7...
0.2 - 2.5
MMX32AA2D4...
MMX32AA2D8...
MMX34AA1D3...
MMX34AA1D9...
MMX34AA2D4...
MMX11AA1D7...
0.2 - 2.5
MMX11AA2D4...
MMX11AA2D8...
MMX11AA3D7...
MMX12AA3D7...
0.2 - 2.5
MMX12AA4D8...
MMX12AA7D0...
MMX32AA3D7...
0.2 - 2.5
MMX32AA4D8...
MMX32AA7D0...
MMX34AA3D3...
0.2 - 2.5
MMX34AA4D3...
MMX34AA5D6...
MMX11AA4D8...
0.2 - 4
MMX12AA9D6...
0.2 - 4
40
M3
AWG
mm
inch
Nm
24 - 12
8
0.31
0.5 - 0.6
24 - 12
8
0.31
0.5 - 0.6
24 - 12
8
0.31
0.5 - 0.6
24 - 12
8
0.31
0.5 - 0.6
24 - 12
8
0.31
0.5 - 0.6
24 - 12
8
0.31
0.5 - 0.6
24 - 10
8
0.31
0.5 - 0.6
24 - 10
8
0.31
0.5 - 0.6
The cross-sections to use in the connections, the tightening
torques for screws and respective fuses are listed in the following.
ft-lbs
mm
0.37 -
0.6 x 3.5
FS1
0.44
L1 L2/N
e
0.37 -
0.6 x 3.5
FS1
0.44
L1 L2/N
e
0.37 -
0.6 x 3.5
FS2
0.44
e
0.37 -
0.6 x 3.5
FS2
0.44
L1 L2/N
e
0.37 -
0.6 x 3.5
FS2
0.44
L1 L2/N
e
0.37 -
0.6 x 3.5
FS2
0.44
L1 L2/N
e
0.37 -
0.6 x 3.5
FS3
0.44
L2/N
e
0.37 -
0.6 x 3.5
FS3
0.44
L1 L2/N
e
04/10 MN04020001Z-EN
U/T1 V/T2 W/T3
e
L3
U/T1 V/T2 W/T3
e
L2/N
L3
U/T1 V/T2 W/T3
e
U/T1 V/T2 W/T3
e
L3
U/T1 V/T2 W/T3
e
L3 R+
R-
U/T1 V/T2 W/T3
e
L3
U/T1 V/T2 W/T3
e
U/T1 V/T2 W/T3
e