Configuring Engage Zone Control Application
4.2. Modifying Intelligent Ag Section Settings
Enter the information below according to your air cart setup.
1. Number of Bins: Input the number of bins on your air cart.
2. Section Ordering: Configure section ordering in the application based on the section
ordering on your toolbar. Numbers 1-8 in the application corresponds with a gate on the
Engage Zone Control unit, as shown in Figure 10.
IMPORTANT: Not all primary lines are connected to the manifold in sequential order.
Make sure that your primary lines correspond with these gate assignments. If they don't,
re-order the primaries to match these gate assignments.
EXAMPLE 1: If your air seeder has 8 sections, configure your section ordering like the
image below.
EXAMPLE 2: If your air seeder has 6 sections, select Off for the two gate positions you
are not using. A 6-section air seeder doesn't use sections 7 and 8.
In the example below, gates 4 and 5 are off.
600890-000059, rev 1.1
Figure 10: Engage Zone Control unit gate numbering
Figure 11: Standard section ordering
Figure 12: Section ordering with sections off
Engage Zone Control Operator's Guide