Commissioning; Leaks And Emissions - ProMinent DULCODOS universal mini Assembly And Operating Instructions Manual

Universal metering system dsua mini metering frame complete with all pipework
Table of Contents

Advertisement

Commissioning

5
Commissioning

5.1 Leaks and Emissions

24
User qualification: trained user, see
n
fication' on page 13
Prerequisite for commissioning:
All installation and assembly work has been per‐
formed by qualified personnel.
The system operator has produced system-specific
operating guidelines and has trained the operating
personnel on the basis of these operating guide‐
lines.
If necessary, the metering system has been
checked, handed over and approved for operation
in line with national standards and regulations.
WARNING!
Danger from hazardous substances!
Possible consequence: Fatal or very serious inju‐
ries.
Please ensure when handling hazardous sub‐
stances that you have read the latest safety data
sheets provided by the manufacture of the haz‐
ardous substance. The actions required are
described in the safety data sheet. Check the
safety data sheet regularly and replace, if neces‐
sary, as the hazard potential of a substance can be
re-evaluated at any time based on new findings.
The system operator is responsible for ensuring
that these safety data sheets are available and that
they are kept up to date, as well as for producing
an associated hazard assessment for the worksta‐
tions affected.
The continuous sound pressure level emitted by the metering
system is max. 70 ±5 dB(A) in accordance with DIN EN ISO
3743-1.
Ä Chapter 2.1 'User quali‐