Connect The Suction Lance Level Gauge - ProMinent DULCODOS universal mini Assembly And Operating Instructions Manual

Universal metering system dsua mini metering frame complete with all pipework
Table of Contents

Advertisement

4.5 Connect the suction lance level gauge

Model: 1 pump, 1 point of injection
Connect the level switch to the pump.
n
Model: 2 pumps, 1 point of injection
Connect the level switch to the active pump.
n
Model: 2 pumps, 2 points of injection
Connect the level switch to the terminal box.
n
Empty signal prompt by a higher-level control (by the cus‐
n
tomer).
The pumps are switched off possibly by the Pause input (by
n
the customer).
Assembly and installation
23

Advertisement

Table of Contents
loading

Table of Contents