Chrysler Sebring 2004 Service Manual page 2134

Table of Contents

Advertisement

P1495-LEAK DETECTION PUMP SOLENOID CIRCUIT —
TEST
3
Turn the ignition off.
Disconnect the Leak Detection Pump harness connector.
Turn the ignition on.
Using a 12-volt test light connected to ground, probe the (F12) Ignition Switch
Output circuit in the LDP harness connector.
Does the test light illuminate brightly?
Yes → Go To 4
→ Repair the Fused Ignition Switch Output circuit.
No
4
Turn the ignition off.
Disconnect the Leak Detection Pump harness connector.
Disconnect the Powertrain Control Module harness connector.
Measure the resistance of the LDP Solenoid Control circuit in the LDP harness
connector to ground.
Is the resistance below 5.0 Ohms?
Yes → Repair the short to ground in the LDP Solenoid Control circuit.
→ Go To 5
No
5
Turn the ignition off.
Disconnect the Leak Detection Pump harness connector.
Disconnect the Powertrain Control Module harness connector.
Measure the resistance of the LDP Solenoid Control circuit between the LDP
Solenoid harness connector and the PCM harness connector.
Is the resistance below 5.0 Ohms?
Yes → Go To 6
→ Repair the open in the LDP Solenoid Control circuit.
No
6
NOTE: Before continuing, check the PCM harness connector terminals for
corrosion, damage, or terminal push out. Repair as necessary.
Using the schematics as a guide, inspect the wire harness and connectors. Pay
particular attention to all Power and Ground circuits.
If there are no possible causes remaining, view repair.
Repair
ACTION
Perform POWERTRAIN VERIFICATION TEST VER - 6.
Perform POWERTRAIN VERIFICATION TEST VER - 6.
Perform POWERTRAIN VERIFICATION TEST VER - 6.
Replace and program the Powertrain Control Module in accor-
dance with the Service Information.
Perform POWERTRAIN VERIFICATION TEST VER - 6.
DRIVEABILITY - GAS
205
Continued
APPLICABILITY
All
All
All
All

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2004Stratus 2004

Table of Contents