Datavideo TLM-170V Instruction Manual page 34

17.3” scopeview production monitor
Hide thumbs Also See for TLM-170V:
Table of Contents

Advertisement

9. Color calibration
On the Display Characterization window (Tools  Calibration  Display Characterization), slide
the Select Cube Side slider to 21 so that the Total Frames measured are 9261. Set Patch Sequence
to Sequential and Select Time per Frame to Closed Loop Mode.
Click the Measure button, the Calibration Status window will appear along with the Calibration
Area and a dialogue box. Drag the Calibration Area onto the TLM-170V. Finally enter a name for
this particular calibration in the dialogue box, point the probe at the calibration area as close as
possible then click the OK button to start calibration. Note that it takes approximately one hour to
perform 9261 point measurements.
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tlm-170vrTlm-170vm

Table of Contents