SSANGYONG Korando 2012 Manual page 835

Hide thumbs Also See for Korando 2012:
Table of Contents

Advertisement

2. JACK-UP POINTS
Stand jack-up points and installation status (front side)
Jack-up points for
2-post lift
Stand jack-up points and installation
Installation status
Jack-up points for
2-post lift
Stand jack-up points and installation
Installation status
01-25
0000-00
status (front side)
status (rear side)

Advertisement

Table of Contents
loading

Table of Contents