Zero Adjust (After Sensor Exchange); Teach-In - Roland R1000 Series Manual

Double sheet detector with integrated fieldbus interface
Hide thumbs Also See for R1000 Series:
Table of Contents

Advertisement

B0060191 / Rev. 1.7
8.3

Zero adjust (after sensor exchange)

Push the MENU key, switch to "change" with the   key and confirm with the ENTER key
1
2
Enter the password (if active)
3
Switch to "System adjustment" and confirm with ENTER key
4
Select the desired program number at the control unit
5
Switch to adjustment parameter "Zero adjust"
6
Select "zero adjust" and confirm with ENTER key
7
The message "remove sheet" appears, perform this and then confirm with ENTER key
8
After the message "zero adjust active" the message "zero adjust completed" is shown.
Then confirm with ENTER key
9
Return into the measurement mode with the MENU key
8.4

Teach-In

Push the MENU key, switch to "change" with the   key and confirm with the ENTER key
1
2
Enter the password (if active)
3
Switch to "Program parameter" and confirm with ENTER key
4
Select the desired program number at the control unit
5
Switch to "Teach-In" (1-sheet or 2-sheet / Part A or Part B)
6
Select "Teach-In statical" or "Teach-In dynamical" and confirm with ENTER key
7
Feed (pan through) a sheet and then confirm with ENTER key
8
Return to the measurement mode with the MENU key
The exact Teach-In procedure is described in the chapter "Program parameters" – "Teach-In".
ROLAND ELECTRONIC GmbH · Otto-Maurer-Str. 17 · DE 75210 Keltern · Phone +49 (0)7236-9392-0 · Fax +49 (0)7236-9392-33
Manual
Double Sheet Detector R1000-series I20
with integrated fieldbus interface
Operation
137

Advertisement

Table of Contents
loading

This manual is also suitable for:

L20

Table of Contents