Cisco UCS S3260 Service Manual page 69

Storage server chassis
Hide thumbs Also See for UCS S3260:
Table of Contents

Advertisement

Chapter 3
Maintaining the System
Connect the terminated end of the cable to the socket on the power supply. The connector is keyed so
Step 3
that the wires align for correct polarity and ground, as shown in
Return DC power from your facility's circuit breaker.
Step 4
Figure 3-17
1
2
Replacing a DC Power Supply
You do not have to power off the system to replace up to one power supply because they are redundant
Note
as 3+1.
Remove the power supply that you are replacing or a blank panel from an empty bay:
Step 1
a.
b.
c.
Install a new power supply:
Step 2
a.
b.
c.
d.
1050 W, –48 VDC Power Supply and Cable
Keyed cable connector
(CAB-48DC-40A-8AWG)
Keyed DC input socket
Remove the CAB-48DC-40A-8AWG keyed cable connector from the power supply that you are
replacing.
Grasp the power supply handle while pinching the release lever toward the handle.
Pull the power supply out of the bay.
Grasp the power supply handle and insert the new power supply into the empty bay.
Push the power supply into the bay until the release lever locks.
Connect the CAB-48DC-40A-8AWG keyed cable connector to the new power supply.
If you powered off the system, press and hold the system Power button for four seconds to return
the system to main power mode.
1
3
PSU status LED
See
Rear-Panel LEDs and Buttons, page 3-4
Cisco UCS S3260 Storage Server Chassis Installation and Service Guide
Installing or Replacing System Components
Figure
3-17.
2
3
1050W DC
+ DC
- DC
for details.
3-35

Advertisement

Table of Contents
loading

Table of Contents