Powerflow™ Heat Management - HEAT GLO PRIMO48 Installation Manual

Hide thumbs Also See for PRIMO48:
Table of Contents

Advertisement

C. PowerFlow™ Heat Management
Introduction
PowerFlow™ Heat Management Systems allow the heat
from the PRIMO appliance to be redirected as desired.
At least one PowerFlow™ Heat Management System is
required on all PRIMO installations and must be installed
by a qualified service technician at the time of the appli-
ance installation. Follow the instructions shipped with the
kit for installation and operation.
WARNING! Risk of Fire! A PowerFlow™ Heat
Management system must be installed and operating
when the appliance is turned on.
appliance and combustible materials will occur.
PowerFlow™ Heat Management System options are:
• HEAT-ZONE-PRIMO: The heat is diverted into an
adjacent room.
• HEAT-OUT-PRIMO: The heat is diverted outside the
home/building.
• PRIMO Passive Heat (PHFR-PRIMO-48 / PHFR-
PRIMO-60 / PHSI-PRIMO): The heat is vented into
the room in which the appliance is installed through
a discharge opening(s). This option is available for
PRIMO48, PRIMO48ST, PRIMO60 and PRIMO60ST
models only.
At least one of these options must be installed and in
operation whenever the appliance is turned on.
The PRIMO may utilize two PowerFlow™ Heat
Management Systems, but not all are compatible. The
HEAT-OUT-PRIMO kit may be used with either HEAT-
ZONE-PRIMO or one of the Passive Heat options. HEAT-
ZONE-PRIMO can not be used with either of the Passive
Heat options. The dedicated seal plates, as shown in
Figure 6.3, must be used only as indicated.
Heat & Glo • PRIMO48, PRIMO48ST, PRIMO60, PRIMO60ST, PRIMO72, PRIMO72ST Installation Manual • 2310-970 Rev. Z • 3/19
30
30
30
Overheating of
Prepare For Heat Management
NOTICE: Additional clearances are required for heat
management systems installations. Provisions must be
made in advance to ensure fit within the framing.
• Determine the heat management system(s) that will be
installed.
• Remove the appropriate seal plate(s).
• Center the duct collar around the exposed hole and
attach it to the appliance.
Note: Do this BEFORE final positioning of the appliance.
• Determine the location for the air register/fan housing
assembly.
Reference the appropriate instructions included with
the PowerFlow™ Heat Management System kit for the
remaining installation steps.
WARNING! Risk of Fire! DO NOT block PRIMO Passive
Heat discharge openings! Overheating of appliance and
combustible materials will occur.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo48stPrimo60Primo60stPrimo72Primo72st

Table of Contents