Installation Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
Customer:
Lot/Address:
Model (circle one): PRIMO48
PRIMO48ST PRIMO60ST PRIMO72ST
WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can
lead to a fire or explosion.
Appliance Install Sections 3 , 6 and 11
Verified that the chase is insulated and sealed. (Pg. 19)
Verified Verified clearances to combustibles. (Pg. 12-18)
Standoffs bent up into installation position and secured (Pg. 28)
Fireplace is leveled and secured. (Pg. 31)
Barrier glass installed correctly. "THIS SIDE OUT" is readable. (Section 11)
Venting/Chimney/PowerFlow™ Heat Management Sections 4,5 and 7
Venting configuration complies to vent diagrams. (Section 4)
Venting installed, locked, secured in place and sealed with correct clearance.
Firestops installed. (Section 5)
Attic insulation shield installed. (Section 5)
Exterior wall/Roof flashing installed and sealed. (Section 7)
Terminations installed and sealed. (Section 7)
PVI-SLP or PVLP-SLP power vent installed with correct baffle setting.
PowerFlow™ Heat Management System(s) installed and vented
properly; complies with vent run min./max. requirements in installation manual.
HEAT-OUT-PRIMO
Electrical Section 8 (Pg 39-44)
Unswitched power (110-120 VAC) provided to the appliance.
LED switch wires properly installed.
If only HEAT-OUT-PRIMO is installed: Wall switch plate and toggle switch not installed.
Gas Section 9 (Pg 45-49)
Proper appliance for fuel type.
Was a conversion performed?
Leak check performed and inlet pressure verified.
Verified proper air shutter setting for installation type.
Verify that the gas access plate remains installed. (Pg 46)
Finishing Section 10 (Pg 50-60)
1/2 inch sheetrock used as recommended.
Verified all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Clean Face finishing complete and complies with clearance
requirements in installation manual.
Barrier glass properly installed between finishing material and barrier glass tabs.
Appliance Setup Section 11 (Pg 61-64)
All packaging and protective materials removed (inside & outside of appliance).
Glass panels and media installed correctly.
Firebox glass assembly installed and secured.
Accessories installed properly.
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
Started appliance and verified no gas leaks exist.
Multicolored LED lights work in all switched positions.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your file.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed ____________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________
 = Contains updated information.
Heat & Glo • PRIMO48, PRIMO48ST, PRIMO60, PRIMO60ST, PRIMO72, PRIMO72ST Installation Manual • 2310-970 Rev. Z • 3/19
ATTENTION INSTALLER:
Follow this Standard Work Checklist
PRIMO60
PRIMO72
HEAT-ZONE-PRIMO
(Builder / Gen. Contractor/) (Installer)
Date Installed:
Location of Fireplace:
Installer:
Dealer/Distributor Phone #
Serial #:
YES
Passive Heat
IF NO, WHY?
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
(Date)
2310-972 Rev. G 1/19