Appliance Preparation; Top Standoff Preparation - HEAT GLO PRIMO48 Installation Manual

Hide thumbs Also See for PRIMO48:
Table of Contents

Advertisement

6

Appliance Preparation

A. Top Standoff Preparation
CAUTION! Risk of Cuts, Abrasions or Flying Debris.
Wear protective gloves and safety glasses during
installation. Sheet metal edges are sharp.
1. Figure 1 shows the standoffs in the position in which
they are shipped. Rotate the four (4) top standoffs up
into vertical position. Push the standoff support tab on
each standoff toward the center of the appliance and
fasten it in place using the supplied screw and pilot hole.
See Figure 6.2.
STANDOFFS
Figure 6.1 Standoffs in Shipping Position
STANDOFFS
Figure 6.2 Standoffs in Vertical Position
Heat & Glo • PRIMO48, PRIMO48ST, PRIMO60, PRIMO60ST, PRIMO72, PRIMO72ST Installation Manual • 2310-970 Rev. Z • 3/19
28
28
28

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo48stPrimo60Primo60stPrimo72Primo72st

Table of Contents