Purging Set-Up - Siemens SITRANS SL Operating Instructions Manual

Continuous gas analysis, in situ laser gas analyzers
Hide thumbs Also See for SITRANS SL:
Table of Contents

Advertisement

Installing
4.5 Purging
4.5.3

Purging set-up

Mount the purging connectors according to the following procedure (see the following figure):
1. Remove the plugs from the RTU/TTU and the process flange.
2. Mount the needle valves and the exit aperture.
3. Attach a piece of 6 mm tubing to the needle valves and route it to an appropriate purging
Note
When using a plastic tube for connecting the purge gas supply, be sure to use the supplied
rigid metal insert.
66
gas source.
CAUTION
Make sure that the purge gas quality is sufficient to avoid rapid degradation of the
visibility in the optical path.
Purging tube
Process flange
Process purging input
Sensor purging output
Figure 4-15
Sensor purging input with needle valve
RTU or TTU (Receiver or transmitter tube unit)
RHU or THU (Receiver or transmitter house unit))
Needle valves
PI (Process interface)
Operating Instructions, 12/2010, A5E01132948-04
SITRANS SL

Advertisement

Table of Contents
loading

Table of Contents