4.2.5

Installation of the purging tubes

Note
The purging tubes are unsymmetrical with slanted ends and must be mounted such that the
larger side of the tube end points against the direction of the process flow.
The purging tubes
customer flange
by the two process gaskets
When using an ANSI 4"/150 lbs process interface the purging tubes
between the ANSI 4" adapter flange delivered with the system and the process interface
Purging tube
Customer flange
Process gaskets
Process interface
Purging tube flange
Figure 4-4
Purge tube mounting
SITRANS SL
Operating Instructions, 12/2010, A5E01132948-04
are mounted by clamping the purging tube flange
and the SITRANS SL process interface
as shown in the following figure.
4.2 Mounting
between the
. The sealing is accomplished
have to be clamped
Installing
.
45