Installation; Installation, Hydraulic; Installation, Electrical - ProMinent Flow Control 3 Operating Instructions Manual

Metering monitor
Table of Contents

Advertisement

5

Installation

User qualification, mechanical installation:
n
trained qualified personnel, see
2.2 'Users' qualifications' on page 7
User qualification, electrical installation:
n
Electrical technician, see
'Users' qualifications' on page 7
5.1

Installation, Hydraulic

Testing
The Flow Control always needs a relief
valve upstream of it to be able to test the
Flow Control.
The Flow Control threaded connections
and the connections to the lines need to
be leak-free.
Operating status
Never allow the Flow Control's maximum
permissible operating pressure (10 bar) to
be exceeded in any operating status of the
system.
Only operate the Flow Control vertically.
Using a foot valve
Install a foot valve on the suction side of
the metering pump. Deposits in the Flow
Control can block the float.
Ä Chapter
Ä Chapter 2.2
Wetted materials:
Housing: PVDF
n
Float: PTFE coating
n
Seals: FPM-B or EPDM, depending on the
n
order number.
When metering aggressive media, take into
consideration the resistance of the materials
used – refer to the ProMinent® Resistance List
in the latest product catalogue or at
www.prominent.com .
5.2

Installation, Electrical

Insert the plug of the metering monitor
cable into the pump's "Metering monitor"
socket
[Flow] identifier now appears at
The
ð
the bottom left of the pump's LCD
display. If not, then switch from
[OFF] to [ON] in the [FLOW] menu
and set the number of permitted
defective strokes. The
menu can only be accessed if the
plug is inserted into the "Metering
monitor" socket.
Installation
[FLOW]
13

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flow control 4Flow control 5

Table of Contents