Start Up - ProMinent Flow Control 3 Operating Instructions Manual

Metering monitor
Table of Contents

Advertisement

Start Up

6
Start Up
User qualification for diagnosis: trained
n
Ä Chapter 2.2 'Users' qualifica‐
user, see
tions' on page 7 .
Recalibration
Recalibrate the pump if you need to after
installation if the pump was calibrated
before the Flow Control was installed.
Not a shut-off device
Never use the Flow Control as a shut-off
device. The rotary dial cannot be used to
block the hole for the float.
Turning the rotary dial under pressure can
temporarily cause leakage, therefore refer
to the latest material safety data sheet for
your feed chemical.
Pump delta
®
Set the delta
®
to "Pressure stroke setting"
– "fast" to ensure that it operates reliably.
Error
Press the P key to acknowledge if the
metering pump goes into "Error" mode
during start up.
Priming
Press both error keys at the same time
on the metering pump.
14
Dynamic adjustment
Minimum values
With low-viscosity feed chemicals up to a
viscosity of approx. 100 mPa. Higher vis‐
cosities on request.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Flow control 4Flow control 5

Table of Contents