Setup; Efr And Plc Connection; Gateway Screens - Graco CGM 25B127 Instructions - Parts Manual

Communications gateway module. for use with electric fixed ratio (efr) systems to provide fieldbus communications abilities. for professional use only.
Table of Contents

Advertisement

Setup

EFR and PLC Connection

Verify the PLC connection parameters are setup
correctly.
NOTE: The connection between the EFR and PLC will
not be made if the PLC connection parameters are not
set up correctly.
Standard Gateway Map: 19A796
Comm. Format
Input Assembly Instance
Input Byte Size
Output Assembly Instance
Output Byte Size

Gateway Screens

The Gateway screens are used to configure the
fieldbus. These screens are shown only if a CGM is
correctly installed in your system. See Installation on
page 3.
1. With the system on and enabled, press
access the Setup screens.
2. Press the left arrow key once to navigate to the
main Gateway screen. See F
F
. 7: Example Fieldbus Screen
IG
3A6338B
Data-SINT
100
42
150
22
to
. 7.
IG
PROFIBUS Fieldbus Screens
These screens are shown only if a PROFIBUS Fieldbus
CGM is installed.
Screen 1
This screen enables the user to set the device address,
install date, location tag, function tag, and description.
F
. 8: PROFIBUS Fieldbus Screen 1
IG
Screen 2
This screen displays the hardware revision, system
serial number, and data map identification information.
F
. 9: PROFIBUS Fieldbus Screen 2
IG
Setup
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgm 26a701Cgm 26a700Cgm 26a702

Table of Contents