Unpacking The Switch - Allied Telesis AT-x220-28GS Installation Manual

Table of Contents

Advertisement

Chapter 2: Installation

Unpacking the switch

22
To unpack the switch, perform the following procedure:
1. Remove all of the components from the shipped package.
Note
Store the packaging material in a safe location. You must use the
original shipping material if you need to return the unit to Allied
Telesis.
2. Place the switch on a level, secure surface.
3. Verify that the shipped package includes the following items:
One 2 m (6.6ft) local management cable
with RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
One regional AC power cord
Power cord retaining clip
Two rack/wall mounting brackets
Eight bracket screws
Four anchors for concrete walls:
Length: 29.6 mm (1 1/8 in)
Diameter: 6.0 mm (0.25 in)
Four screws for wood or concrete walls:
Length: 31 mm (1/14 in)
Width: 4.3 mm (1/8 in)
Fo
Four rubber feet with push-in snap rivets

Advertisement

Table of Contents
loading

Table of Contents