Reading current values
4x
2x
Fig.58
Reading out the hour counter
5x
2x
123157 - v.12 - 07022018
1. Press the two
The
2. Confirm by pressing the
The screen alternates between the parameter
status, e.g.
3. Press the
The screen alternates between the parameter
sub-status, e.g.
4. Press the
The screen alternates between the parameter
flow temperature, e.g.
5. Press the
ters
6. Press the
The screen alternates between the parameter
nal setpoint, e.g.
7. Press the
The screen alternates between the parameter
ionisation current, e.g.
8. Press the
The screen alternates between the parameter
fan speed, e.g.
9. Press the
The screen alternates between the parameter
water pressure, e.g.
nected, [-.-]appears on the display.
10. Press the
The screen alternates between the parameter
modulation percentage, e.g.
11. Press the
The readout cycle starts again with the parameter
12. Press the
AD-0000073-02
display.
9.3.2
Reading out the hour counter and percentage of suc­
cessful starts
1. Press the two
until the symbol flashes in the menu bar.
2. Press the
The display alternates between
erating hours, for example
3. Press the
The display alternates between
hours for CH operation, for example
4. Press the
The display alternates between
cessful starts, for example
5. Press the
tion display.
AD-0000074-01
keys at the same time.
symbol flashes.
key.
.
key.
.
key.
°C.
key successively to scroll through the various parame­
,
,
,
.
key.
°C.
key.
µA.
key.
rpm.
key.
bar. If no water pressure sensor is con­
key.
key.
key twice to exit this menu and return to the operation
keys at the same time and then press the
key.
key; the display shows
key; the display shows
%.
key twice to leave this menu and return to the opera­
9 Settings
and the current
and the current
and the current
and the inter­
and the current
and the current
and the current
and the current
%.
.
and the number of boiler op­
.
.
and the number of burning
.
.
and the percentage of suc­
key
59

Advertisement

Table of Contents
loading

Table of Contents