Peak Pilates ARTISTRY SERIES Assembly And Owner's Manual page 25

Includes reformer & tws / fws towers
Table of Contents

Advertisement

Removing the Push-Through Bar
The tower comes with the push-through bar already attached. Because the
push through bar swings freely, we recommend removing from the tower before
attaching the tower to the reformer frame. To remove the push-through bar from
the tower, please follow the instructions below:
Fig. 28
Fig. 29
Fig. 30
Fig. 31
1. Locate the two black handles at the
pivot end of the push-through bar.
2. Press the circular button at the top
of the handle, then pull the handle
out to release it from the tower
(Fig. 28)
Note: This step requires at least
two people. (Fig. 29)
Once the tower brackets have been
installed on the frame, you can now
attach the tower into the reformer. Two
or more people are required to complete
these steps.
1. Carefully remove the tower from the
box.
2. Grip the tower with two hands, with
one hand on the preassembled
pulleys. (Fig. 30) Carry it over to the
reformer.
3. Still holding onto the pulleys, lift
the tower and slide it into the tower
brackets until it sits securely against
the bottom of both brackets.
(Fig. 31)
Note: The preinstalled pulley
mounts on the tower must be on
the outside of the reformer frame,
with the pulleys pointing inward.

Advertisement

Table of Contents
loading

Table of Contents