Maintenance; Introduction; Materials - GE Druck ADTS 405 R/F Mk2 Instruction Manual

Air data test set
Table of Contents

Advertisement

4. MAINTENANCE

4.1 Introduction

This section details the recommended maintenance tasks to be carried out by the operator. The
maintenance chart shows the periodicity of each task and a code referenced to the task detailed in
4.3 Maintenance Tasks.
Task
Inspect
Inspect
Test
Test
Calibrate
Replace
Clean
Service
Service
* Periodicity may change depending on usage and environment, refer to the
Engineering Authority.

4.2 Materials

This lists materials required for the user to maintain the ADTS 405. The item number and name in
the table identifies the item in the maintenance tasks (for example, "Use a soft bristle brush, item 4,
Table 4-2"). The description provides further information required to identify the item.
Note: Equivalent substitutes can be used.
© 2015 General Electric Company – All rights reserved.
Table 4-1: Maintenance Chart
Code
A
Daily, before use
B
Weekly
C
Before use
D
Daily, before use
E
Every 12 months *
As detailed in fault finding or when detailed after
F
inspection
G
Weekly *
1,000 hours recorded by the pump unit elapsed time
H
indicator or the equipment running log
3,000 hours recorded by the pump unit elapsed time
J
indicator or the equipment running log
Table 4-2: Materials List
Item
Item Name, Description
Number
1
Cloth, Cotton, Lint-free
Alcohol, Isopropyl (MIL-A-10428,
2
Grade A)
3
Detergent, Mild, liquid
4
Brush, soft bristle (MIL-B-43871)
Period
ADTS 405 Mk2 Instruction Manual-English | 51
Introduction

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents