Power-Up; System Status - GE Druck ADTS 405 R/F Mk2 Instruction Manual

Air data test set
Table of Contents

Advertisement

Chapter 3. OPERATION

3.2.2 Power-up

a.
Check the power indicator is illuminated and set the front panel power switch to
OPERATE.
b.
The display will show the following sequence:
1.
Power-up screen.
2.
ADTS 405 power-up screen.
3.
Date of the last calibration and type of main transducer fitted.
4.
Self-test message.
5.
Measuring ground pressure message.
6.
Equalizing system pressures message.
7.
Display shows Leak Measure mode and the number of parameters last selected in
configuration.
i.
The display, on the front panel or
hand-terminal, shows:
DK425 V.xx
Display Power Up
Please Wait
Note: V.xx will display the current software version number.
ii.
After a short time the display
shows:
DRUCK
ADTS 405
DK415
VER.xx
Last Calibration
dd/mm/yy (dmy)
RPT Transducer
PLEASE WAIT
iii.
Date format can be set to a leading value of day or month in SETUP.
16 | ADTS 405 Mk2 Instruction Manual-English

SYSTEM STATUS

RED - FAULT
SYSTEM STATUS
ORANGE - NOT READY
© 2015 General Electric Company – All rights reserved.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents