Commissioning

8 Commissioning
1. Activate external power switch.
2. Perform check of piping installation.
3. Check flow meter for device errors, warnings or alarms,
4. Configure the transmitter, see chapter default settings at User´s Manual.
ð Flow meter is ready for operation.