Figure 2-43 Assemble Battery Box Base; Figure 2-44 Wall-Mount Spacing Guide - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
Plywood should first be installed on the wall where the Battery Box will be positioned. This allows secure
anchoring of the screws which support the weight of the Battery Box.
1.
Using four supplied screws, secure the WM Support to the FM/WM Base-F and Base-R.
WM Support
FM/WM Base-F
2.
Refer to
Figure 2-44 Wall-Mount Spacing Guide on page 2-33
holes for 10 mm anchor bolts (locally procured).
Mark and drill the four holes required to install the FM/WM Base.
2-32
Four Screws
(M4 X 8)

Figure 2-43 Assemble Battery Box Base

FM/WM Base-R
for required spacing before drilling
ISSUE 1.0
Installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents