Figure 4-11 Push In And Hold The Load Button; Figure 4-12 Status Led; Figure 4-13 Remove The Sd Card - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

SL2100
5.
Push in and hold the LOAD button on the CPU-C1.
CPU board
6.
Turn the system power on.
7.
Continue holding the LOAD button for approximately 10 seconds or until RUN LED lights.
8.
Release the LOAD button.
9.
Wait until the RUN LED (green) and ALM LED (red) starts flashing (1s on/1s off) on the CPU-C1
board has the following indications (approximately seven minutes).
10. Turn the power off (wait about 10 seconds) and remove the CPU-C1 board from Main Chassis
and SD card from the SD slot on the CPU-C1.
4-8
ETHERNET VOIPDB
EXP1
< Front view >

Figure 4-11 Push in and hold the LOAD button

RUN LED
ETHERNET VOIPDB
CPU board

Figure 4-12 Status LED

Figure 4-13 Remove the SD card

ST 100 1G ACT
RUN
ALM
LOAD
EXP2
ST 100 1G ACT
RUN
ALM
LOAD
EXP1
EXP2
< Front view >
CPU board
ISSUE 1.0
LOAD button
SD card
Screws
Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents