Table 2-4 Items On The Cpu Board; Figure 2-4 Insert The Cpu Board; Figure 2-5 Connector And Switch Location On The Cpu Board - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

ISSUE 1.0
4.
Insert the CPU board in the guide rail of Main Chassis and push it securely into position and
tighten the two screws of CPU board.
1.3.4 Connector and Switch
ETHERNET (J11)
LAN cable connector
CPU board

Figure 2-5 Connector and Switch Location on the CPU Board

Item
LOAD Switch (S1)
Hardware Manual
Guide rail

Figure 2-4 Insert the CPU Board

ETHERNET VOIPDB
< Front view >

Table 2-4 Items on the CPU Board

Switch for System Restart/System Reset (Cold start occurs)/Upload Software
CPU board
ST 100 1G ACT
RUN
ALM
LOAD
EXP1
EXP2
Description
SL2100
Screws
LOAD switch (S1)
2-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents