Table 2-5 Exifb-C1 Packing List; Table 2-6 Connectors Of Exifb-C1; Figure 2-16 Connectors Of Exifb-C1; Installation Of The Exifb-C1 - NEC SL2100 Hardware Manual

Hide thumbs Also See for SL2100:
Table of Contents

Advertisement

ISSUE 1.0

1.7.2 Installation of the EXIFB-C1

1.7.2.1 Unpacking
Unpack the EXIFB-C1 and check it against physical damage.
Items
EXIFB-C1
1.7.2.2 Connectors Location
J1 (EXP1)
J2 (EXP2)
No.
Connectors
J1 (EXP1)
Expansion Connector
J2 (EXP2)
Expansion Connector
J3
CPU Board
1.7.2.3 Installing the EXIFB-C1 Board
Not all boards are hot swappable. Do not remove or install from the chassis
when powering up.
Do Not Power on until all installations have been completed.
1.
Turn off the system power.
Hardware Manual

Table 2-5 EXIFB-C1 Packing List

List of Contents
EXIFB-C1 Board
Metal Spacers
Screws (with Circular Washer)
Springwashers
Nuts

Figure 2-16 Connectors of EXIFB-C1

Table 2-6 Connectors of EXIFB-C1

J2 (EXP) connector on the EXIFE-C1 board of the Expansion Chassis 1
J2 (EXP) connector on the EXIFE-C1 board of the Expansion Chassis 2
J22 connector on the CPU-C1
Connectable Devices
SL2100
QTY
1
4
4
4
4
J3
2-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents